Holleran home

Key Services

Holleran : cable-power

Case Studies

Working with Network Rail

Holleran has undertaken contracts for twenty three sub stations for SABCO and a further twelve for Wessex Power Upgrade (WPU) also eight feeder routes for WPU and a further three for SABCO, equating to approximately 52km and 70km of track route respectively. Many of these track routes have more than one feeder route, the length of route therefore being in excess of the track route distance. The formation of these routes required the construction of over thirty under track crossings (UTXs). Millbrook, which was one of the larger UTX structures crosses seven roads and is approximately 54m in length.